References;
-
Employer Project Name / City - Country Contract Subject Period
(month)Ending Date Contract Price Monetary Unit Description BP Mersin Atas Terminal

TERMINAL CONVERSION PROJECT STORAGE TANKS FLOATING ROOF RGA EQUIPMENT 6 months 2007 75.000,00 EURO PRODUCT STORAGE TANKS FLOATING ROOF GROUNDING SYSTEM INSTALLATION (RGA) (60 EA) BP Mersin Atas Terminal

INTEGRITY MANAGEMENT PROJECTS CCTV SYSTEM 4 months 2007 85.000,00 EURO IMPROVEMENT OF TERMINAL FENCE CCTV ( EXISTING CABLES REPLACED WITH FIBEROPTICS AND ALL CAMERAS AND CENTRAL ELECTRONICS RENEWED . 10.000 m FIBEROPTIC CABLES INSTALLED AND 35 CAMERA RENEWED WITHIN THE SCOPE OF THIS PROJECT). BP Mersin Atas Terminal

TERMINAL CONVERSION PROJECT TERMINAL DCS (EMERSON DELTA-V) AND ESD SYSTEM 4 months 2008 250.000,00 EURO CENTRAL CONTROL ROOM DCS (EMERSON DELTA-V) AND EMERGENCY SHUTDOWN SYSTEM (ESD) BP Mersin Atas Terminal

TERMINAL CONVERSION PROJECT STORAGE TANKS LEVEL ALARM SYSTEM 12 months 2008 280.000,00 EURO PRODUCT STORAGE SYSTEM TANKS LEVEL ALARM SYSTEM(60 EA) BP Mersin Atas Terminal

TERMINAL CONVERSION PROJECT STORAGE TANKS SEAL FLAME DETECTION SYSTEM 6 months 2008 120.000,00 EURO PRODUCT STORAGE TANKS FLAME DETECTION ( SEAL AREA) LINEAR HEAT DETECTION SYSTEM (20 EA) BP Mersin Atas Terminal

TERMINAL CONVERSION PROJECT MOTOR OPERATED VALVES (MOV) ON STORAGE TANKS INLET AND OUTLET LINES 16 months 2008 350.000,00 EURO MOTOR OPERATED VALVES AND REMOTE CONTROL PROFIBUS INSTALLATION FOR PRODUCT STORAGE TANKS INLET AND OUTLET LINES (160 EA) BP Mersin Atas Terminal

TERMINAL CONVERSION PROJECT 6.6 KV TRANSFORMER AND SWITCH CENTRE 14 months 2008 125.000,00 EURO 6.6 KV TRANSFORMER AND SWITCH CENTRE FOR NEW STORAGE AREA MANIFOLD BP Mersin Atas Terminal

TERMINAL CONVERSION PROJECT MCC & INVERTERS 4 months 2008 115.000,00 EURO NEW SWITCH CENTRE MCC MONTAJI AND INVERTER INSTALLATION FOR NEW PRODUCT PUMPS BP Mersin Atas Terminal

TERMINAL CONVERSION PROJECT SMOKE DETECTION SYSTEM (AIR SENSE) 2 months 2008 55.000,00 EURO SMOKE DETECTION SYSTEM (AIR SENSE) FOR 6.6 KV SWITCH CENTRE AND BOILER CONTROL ROOM BP Mersin Atas Terminal

TERMINAL CONVERSION PROJECT PRODUCT METERING STATION 4 months 2008 85.000,00 EURO PRODUCT METERING STATION FOR RAIL TRCUK LOADING PLATFORM BP Mersin Atas Terminal

TERMINAL CONVERSION PROJECT ADDITIVE SYSTEM 4 months 2008 75.000,00 EURO ADDITIVE SYSTEM INSTALLATION AT TRUCK LOADING AREA BP Mersin Atas Terminal

TERMINAL CONVERSION PROJECT ELECTRICAL ISOLATION OF ALL ELECTRICAL EQUIPMENTS BEFORE DEMOLISHING OF REFINERY 5 months 2008 65.000,00 EURO ELECTRICAL ISOLATION OF ALL MOTORS, TRANSFORMERS, SWITCH CENTRES, DCS (ROSEMOUNT RS-3) , BOILER CONTROL SYSTEM, ALL FIELD INSTRUMENTATION AS A PREPARATOIN FOR DEMOLISHING OF REFINERY PLANT STRUCTURES. BP Mersin Atas Terminal

INTEGRITY MANAGEMENT PROJECTS FENCE LIGHTING SYSTEM 4 months 2008 120.000,00 EURO FENCE LIGHTING SYSTEM ALONG THE TERMINAL FENCE INCLUDING 174 EA. LIHTING POLE & ARMATURE, 6 EA ELECTRICAL DISTRIBUTION PANEL POWER AND GROUNDING INSTALLATION. BP Mersin Atas Terminal

INTEGRITY MANAGEMENT PROJECTS EMERGENCY GENERATOR AUTOMATION SYSTEM 3 months 2009 75.000,00 EURO AUTOMATION SYSTEM FOR EMERGENCY GENERATOR AT TERMINAL MAIN SWITCH CENTRE BP Mersin Atas Terminal

INTEGRITY MANAGEMENT PROJECTS TRUCK LOADING AREA DCS SYSTEM (EMERSON DELTA-V) 4 months 2008 350.000,00 EURO DCS SYSTEM (EMERSON DELTA-V) FOR TERMINAL TRUCK LOADING AREA BP Mersin Atas Terminal

TERMINAL CONVERSION PROJECT PRODUCT STORAGE TANKS RTG SYSTEM 12 months 2009 245.000,00 EURO PRODUCT STORAGE TANKS RTG (ENRAF) SYSTEM (60 EA) BP Mersin Atas Terminal

INTEGRITY MANAGEMENT PROJECTS FIBEROPTIC INFRASTRUCTURE FOR AUTOMATION SYSTEM 4 months 2009 130.000,00 EURO FIBEROPTIC COMMUNICATION INFRASTRUCTURE FOR AUTOMATION SYSTEM BP Mersin Atas Terminal

INTEGRITY MANAGEMENT PROJECTS ADDITIVE SYSTEM 3 months 2009 55.000,00 EURO ADDITIVE SYSTEM IMPROVEMENT AT TRUCK LOADING AREA BP Mersin Atas Terminal

INTEGRITY MANAGEMENT PROJECTS STORAGE TANKS GROUNDING SYSTEM 6 months 2009 145.000,00 EURO IMPROVEMENT OF GROUNDING SYSTEM OF ALL STORAGE TANKS (70 EA) AT TERMINAL AND WHARF AREA. BP Mersin Atas Terminal

INTEGRITY MANAGEMENT PROJECTS GAS AND FLAME DETECTION SYSTEM 6 months 2009 180.000,00 EURO GAS AND FLAME DETECTION SYSTEM FOR TERMINAL AND WHARF AREA. 60 EA. GAS, 30 EA. FLAME DEDECTOR, 12 EA HORN AND 12 AD.BACON. BP Mersin Atas Terminal

INTEGRITY MANAGEMENT PROJECTS CHEMICAL STORAGE BUILDING LIGHTING SYSTEM 2 months 2009 60.000,00 EURO CHEMICAL STORAGE BUILDING LIGHTING SYSTEM BP Mersin Atas Terminal

INTEGRITY MANAGEMENT PROJECTS SECURITY SYSTEM 2 months 2009 75.000,00 EURO AUTOMATIC BARIER, WALKTHROUGH METAL DETECTOR AND FINGER PRINT ID SYSTEM FOR LABRATORY PERSONEL MAIN ENTRANCE. BP Mersin Atas Terminal

INTEGRITY MANAGEMENT PROJECTS JETTY STRUCTURE GROUNDING 2 months 2009 85.000,00 EURO IMPROVEMENT OF JETTY STRUCTURE GROUNDING BP Mersin Atas Terminal

TERMINAL PROJECT CATODIC PROTECTION 4 months 2009 120.000,00 EURO IMPROVEMENT OF CATOD. PROTECTION SYSTEM FOR JETTY PIPE LINE BP Kırıkkale Rail Truck Unloading Facility

METERING SYSTEM METERING SYSTEM AND PUMPS STATION 4 months 2009 190.000,00 EURO NEW LOADING ISLANDS METERING SYSTEMS, PUMPS STATION ELECTRICAL INSTALLATION AND MCC BP Gemlik Terminal

METERING SYSTEM METERING SYSTEM IMPROVEMENT 4 months 2009 290.000,00 EURO EXISTING METERING SYSTEM AT 5 TRUCK LOADING ISLANDS HAS BEEN UPGRADED BP Gaz Dörtyol Terminal

EX-PROOF-ATEX IMPROVEMENT OF EX-PROOF INSTALLATION 3 months 2009 90.000,00 EURO ELECTRICAL INSTALLATIONS REVIEWED AND HAS BEEN IMPROVED TO MEET ATEX STANDARTS