References;

 

  • Employer Project Name / City - Country Contract Subject Period
    (month)
    Ending  Date Contract Price Monetary Unit Description

    BP Mersin Atas Terminal

    TERMINAL CONVERSION PROJECT STORAGE TANKS FLOATING ROOF RGA EQUIPMENT 6 months 2007 75.000,00 EURO PRODUCT STORAGE TANKS FLOATING ROOF GROUNDING SYSTEM INSTALLATION (RGA)  (60 EA)

    BP Mersin Atas Terminal

    INTEGRITY MANAGEMENT PROJECTS CCTV SYSTEM  4 months 2007 85.000,00 EURO IMPROVEMENT OF TERMINAL FENCE CCTV ( EXISTING CABLES REPLACED WITH FIBEROPTICS AND ALL CAMERAS AND CENTRAL ELECTRONICS RENEWED . 10.000 m FIBEROPTIC CABLES INSTALLED AND 35 CAMERA RENEWED WITHIN THE SCOPE OF THIS PROJECT).

    BP Mersin Atas Terminal

    TERMINAL CONVERSION PROJECT TERMINAL DCS (EMERSON DELTA-V) AND  ESD SYSTEM  4 months 2008 250.000,00 EURO CENTRAL CONTROL ROOM DCS (EMERSON DELTA-V) AND EMERGENCY SHUTDOWN SYSTEM (ESD)

    BP Mersin Atas Terminal

    TERMINAL CONVERSION PROJECT STORAGE TANKS LEVEL ALARM SYSTEM 12 months 2008 280.000,00 EURO PRODUCT STORAGE SYSTEM TANKS LEVEL ALARM SYSTEM(60 EA)

    BP Mersin Atas Terminal

    TERMINAL CONVERSION PROJECT STORAGE TANKS SEAL FLAME DETECTION SYSTEM  6 months 2008 120.000,00 EURO PRODUCT STORAGE TANKS FLAME DETECTION ( SEAL AREA) LINEAR HEAT DETECTION SYSTEM  (20 EA)

    BP Mersin Atas Terminal

    TERMINAL CONVERSION PROJECT MOTOR OPERATED VALVES (MOV) ON STORAGE TANKS INLET AND OUTLET LINES 16 months 2008 350.000,00 EURO MOTOR OPERATED VALVES AND REMOTE CONTROL PROFIBUS INSTALLATION FOR PRODUCT STORAGE TANKS INLET AND OUTLET LINES (160 EA)

    BP Mersin Atas Terminal

    TERMINAL CONVERSION PROJECT 6.6 KV TRANSFORMER AND SWITCH CENTRE 14 months 2008 125.000,00 EURO 6.6 KV TRANSFORMER AND SWITCH CENTRE FOR NEW STORAGE AREA MANIFOLD

    BP Mersin Atas Terminal

    TERMINAL CONVERSION PROJECT MCC & INVERTERS 4 months 2008 115.000,00 EURO NEW SWITCH CENTRE MCC MONTAJI AND INVERTER INSTALLATION FOR NEW PRODUCT PUMPS

    BP Mersin Atas Terminal

    TERMINAL CONVERSION PROJECT SMOKE DETECTION SYSTEM (AIR SENSE) 2 months 2008 55.000,00 EURO SMOKE DETECTION SYSTEM (AIR SENSE) FOR 6.6 KV SWITCH CENTRE AND BOILER CONTROL ROOM

    BP Mersin Atas Terminal

    TERMINAL CONVERSION PROJECT PRODUCT METERING STATION 4 months 2008 85.000,00 EURO PRODUCT METERING STATION FOR RAIL TRCUK LOADING PLATFORM

    BP Mersin Atas Terminal

    TERMINAL CONVERSION PROJECT ADDITIVE SYSTEM  4 months 2008 75.000,00 EURO ADDITIVE SYSTEM INSTALLATION AT TRUCK LOADING AREA

    BP Mersin Atas Terminal

    TERMINAL CONVERSION PROJECT ELECTRICAL ISOLATION OF ALL ELECTRICAL EQUIPMENTS BEFORE  DEMOLISHING OF REFINERY  5 months 2008 65.000,00 EURO ELECTRICAL ISOLATION OF ALL MOTORS, TRANSFORMERS,  SWITCH CENTRES, DCS (ROSEMOUNT RS-3) , BOILER CONTROL SYSTEM, ALL FIELD INSTRUMENTATION AS A PREPARATOIN FOR DEMOLISHING OF REFINERY PLANT STRUCTURES.

    BP Mersin Atas Terminal

    INTEGRITY MANAGEMENT PROJECTS FENCE LIGHTING SYSTEM 4 months 2008 120.000,00 EURO FENCE LIGHTING SYSTEM ALONG THE TERMINAL FENCE INCLUDING 174 EA. LIHTING POLE & ARMATURE, 6 EA ELECTRICAL DISTRIBUTION PANEL  POWER AND GROUNDING INSTALLATION.

    BP Mersin Atas Terminal

    INTEGRITY MANAGEMENT PROJECTS EMERGENCY GENERATOR AUTOMATION SYSTEM 3 months 2009 75.000,00 EURO AUTOMATION SYSTEM FOR EMERGENCY GENERATOR AT  TERMINAL MAIN SWITCH CENTRE

    BP Mersin Atas Terminal

    INTEGRITY MANAGEMENT PROJECTS  TRUCK LOADING AREA DCS SYSTEM (EMERSON DELTA-V) 4 months 2008 350.000,00 EURO  DCS SYSTEM (EMERSON DELTA-V) FOR TERMINAL TRUCK LOADING AREA

    BP Mersin Atas Terminal

    TERMINAL CONVERSION PROJECT PRODUCT STORAGE TANKS RTG SYSTEM 12 months 2009 245.000,00 EURO PRODUCT STORAGE TANKS RTG (ENRAF) SYSTEM  (60 EA)

    BP Mersin Atas Terminal

    INTEGRITY MANAGEMENT PROJECTS FIBEROPTIC INFRASTRUCTURE FOR AUTOMATION SYSTEM 4 months 2009 130.000,00 EURO FIBEROPTIC COMMUNICATION INFRASTRUCTURE FOR AUTOMATION SYSTEM

    BP Mersin Atas Terminal

    INTEGRITY MANAGEMENT PROJECTS ADDITIVE SYSTEM 3 months 2009 55.000,00 EURO ADDITIVE SYSTEM IMPROVEMENT AT TRUCK LOADING AREA

    BP Mersin Atas Terminal

    INTEGRITY MANAGEMENT PROJECTS STORAGE TANKS GROUNDING SYSTEM 6 months 2009 145.000,00 EURO IMPROVEMENT OF GROUNDING SYSTEM OF ALL STORAGE TANKS (70 EA) AT TERMINAL AND WHARF AREA.

    BP Mersin Atas Terminal

    INTEGRITY MANAGEMENT PROJECTS GAS AND FLAME DETECTION SYSTEM 6 months 2009 180.000,00 EURO GAS AND FLAME DETECTION SYSTEM FOR TERMINAL AND WHARF AREA. 60 EA. GAS, 30 EA. FLAME DEDECTOR, 12 EA  HORN AND 12 AD.BACON.

    BP Mersin Atas Terminal

    INTEGRITY MANAGEMENT PROJECTS CHEMICAL STORAGE BUILDING LIGHTING SYSTEM 2 months 2009 60.000,00 EURO CHEMICAL STORAGE BUILDING LIGHTING SYSTEM

    BP Mersin Atas Terminal

    INTEGRITY MANAGEMENT PROJECTS SECURITY SYSTEM 2 months 2009 75.000,00 EURO AUTOMATIC BARIER, WALKTHROUGH METAL DETECTOR AND FINGER PRINT ID SYSTEM FOR LABRATORY PERSONEL MAIN ENTRANCE.

    BP Mersin Atas Terminal

    INTEGRITY MANAGEMENT PROJECTS JETTY STRUCTURE GROUNDING 2 months 2009 85.000,00 EURO IMPROVEMENT OF JETTY STRUCTURE GROUNDING

    BP Mersin Atas Terminal

    TERMINAL PROJECT CATODIC PROTECTION 4 months 2009 120.000,00 EURO IMPROVEMENT OF CATOD. PROTECTION SYSTEM FOR JETTY PIPE LINE

    BP Kırıkkale Rail Truck Unloading Facility

    METERING SYSTEM METERING SYSTEM AND PUMPS STATION 4 months 2009 190.000,00 EURO NEW LOADING ISLANDS METERING SYSTEMS, PUMPS STATION ELECTRICAL INSTALLATION AND MCC 

    BP Gemlik Terminal

    METERING SYSTEM METERING SYSTEM IMPROVEMENT 4 months 2009 290.000,00 EURO EXISTING METERING SYSTEM AT 5 TRUCK LOADING ISLANDS HAS BEEN UPGRADED

    BP Gaz Dörtyol Terminal

    EX-PROOF-ATEX IMPROVEMENT OF EX-PROOF INSTALLATION 3 months 2009 90.000,00 EURO ELECTRICAL INSTALLATIONS REVIEWED AND HAS BEEN IMPROVED TO MEET ATEX STANDARTS 

 

 

 

 

 